Skip to main content
Daniel J Glover
Back to Blog

Cloudflare memory savings: the lesson

Published
Coverage:
5 min read
Article overview
Written by Daniel J Glover

Practical perspective from an IT leader working across operations, security, automation, and change.

Published 9 September 2026

5 minute read with practical, decision-oriented guidance.

Best suited for

Leaders and operators looking for concise, actionable takeaways.

Retrospective covering 28 August 2026, written on 9 September 2026.

Cloudflare memory savings offer a useful procurement lesson: before approving more infrastructure, establish whether the constraint comes from useful work or avoidable overhead. My assessment is that the transferable idea is measurement. A smaller business should not expect Cloudflare's fleet-wide result to translate directly into its own bill.

On 27 August, Cloudflare reported reclaiming approximately 100 terabytes of DNS resolver memory, with benchmarked cache entries shrinking from 953 to 420 bytes. Cloudflare engineering report.

What the announcement actually establishes

Engineers removed unused growth capacity, combined record lists, avoided repeated domain names and packed record data into a byte buffer. Cloudflare's explanation.

Whole-process savings were smaller than the benchmark improvement. Cloudflare also distinguished steady-state usage from temporarily empty caches after restarts. These are supplier measurements. Production results.

That distinction should shape your own evidence request. An impressive screenshot immediately after a restart is insufficient. Ask for the service after normal working patterns have returned, including its busiest business period. For an accounting application, that might mean the relevant reporting cycle. For an online shop, choose the demand pattern that actually determines capacity.

The announcement also does not demonstrate that a particular customer can remove a server or negotiate a lower subscription. Those are separate commercial decisions. A technical team should explain which resource becomes unnecessary and how the saving reaches the budget.

Start with the purchasing decision

An optimisation project becomes easier to judge when it starts with a concrete decision: approve the proposed capacity increase, defer it, or fund a bounded investigation. Avoid an open-ended instruction to make everything more efficient.

Write down the business consequence of the current limit. Are customers waiting? Is a reporting job missing its deadline? Is the concern only a utilisation alert? Each problem needs a different success measure. A high utilisation percentage can be acceptable if the service meets demand and recovers safely; a low average can still conceal a damaging peak.

Next identify who can change the software. An internal development team may be able to investigate allocation patterns. A customer of a managed application may only be able to change retention settings, workload timing or service tier. Do not commission engineering work that the contract prevents you from deploying.

For a wider assessment of the budget, use the cloud cost optimisation guide. The question here is narrower: what evidence would justify this particular capacity purchase?

A practical comparison sheet

Ask the service owner to complete a short comparison before requesting funds.

DecisionEvidence requiredCommon mistake
Buy more capacityDemand forecast and the actual limiting resourceTreating an alert as a business case
Optimise existing softwareRepeatable measurement and a deployable changeAssuming a lab result is a bill reduction
Change workload timingBusiness acceptance of a different completion timeMoving the problem to another team
Remove unused workNamed owner confirming it is unnecessaryDeleting something because nobody answered

Include the cost of the investigation itself. Engineering attention has an opportunity cost even when nobody raises a purchase order. A saving that consumes a scarce specialist for weeks may be less attractive than a simple capacity increase, particularly when that specialist is needed for a customer commitment.

Use the IT budget business case template to make those alternatives visible. A proposal should contain the rejected options and their disadvantages, not just the preferred solution.

Design a pilot that can disprove the idea

Choose a representative workload and keep the baseline. Record the demand, configuration and software version alongside the measurements. Otherwise an improvement could come from fewer requests rather than the proposed change.

Agree stop conditions before deployment. These might include slower completion, higher error rates, unexplained resource growth or recovery that needs manual intervention. The exact limits belong to your service owner. Writing them down prevents a team from redefining success after seeing the results.

Check recovery as well as normal operation. Ask what happens after a restart, after a failed deployment and when a dependency becomes slow. An optimisation should not quietly remove the headroom that makes the service recoverable.

Finally, distinguish an engineering success from a procurement success. The first means the workload consumes fewer resources without unacceptable side effects. The second means you have cancelled, reduced or deferred an identifiable cost. Record both separately so finance can follow the claim.

Decide where the recovered capacity goes

Consider an illustrative reporting service awaiting a memory upgrade. If a tested change makes the existing machine adequate, record whether the purchase was cancelled or merely deferred. The same engineering result supports different financial claims, depending on what the business actually decides.

There are useful outcomes beyond an immediate bill reduction. A business might use the capacity for more customers, better resilience or a delayed hardware replacement. Those can be worthwhile, but describe them accurately.

If the decision is to retain the capacity, record what it is reserved for and when the decision will be revisited. Otherwise the original saving can disappear into unplanned growth without anyone learning whether the project delivered its intended benefit.

My recommendation is to approve a small evidence-gathering exercise when a pending purchase is material and the team controls the relevant workload. Ask for a decision, measurements and a rollback route. Cloudflare's headline is a reason to investigate your assumptions, not a percentage to paste into your forecast.

Frequently Asked Questions

Will Cloudflare's memory savings reduce my bill?

The engineering announcement does not establish a price reduction for your service. Treat it as a reason to ask better capacity questions, rather than a saving to include in your budget. Your own business case needs a billable resource that can actually be removed, or a clearly identified purchase that can be deferred.

Should a small business optimise software before buying hardware?

Compare both options against the same service requirement. Optimisation makes sense when you control the relevant software, can measure a repeatable bottleneck and have a safe way to deploy the change. Buying capacity may be preferable when the constraint is urgent, engineering capacity is scarce or the application belongs to a supplier.

What should an infrastructure optimisation pilot measure?

Record memory use under representative demand, response times, errors, operator effort and the eventual billing effect. Include restart and recovery behaviour so an attractive steady-state result does not hide a fragile deployment. Agree the acceptable thresholds before making the change, then retain the old configuration until the comparison and rollback exercise are complete.

Share this post

About the author

DG

Daniel J Glover

IT Leader with experience spanning IT management, compliance, development, automation, AI, and project management. I write about technology, leadership, and building better systems.

Continue exploring

Keep building context around this topic

Jump to closely related posts and topic hubs to deepen understanding and discover connected ideas faster.

Browse all articles

Explore topic hubs

Ready to Improve Your IT Operations?

Book a free 30-minute consultation to discuss your IT challenges. No commitment required, just a focused conversation about where you want to be.

Book a consultation

Get Occasional IT Leadership Insights

IT leadership insights, occasionally. No fluff. Unsubscribe any time.

No spam. Unsubscribe any time.